Key Projects | View Keltbray's Extensive Project Experience

Fulham Wharf

Keltbray Remediation were contracted to undertake bulk excavation management and off-site removal of soils to facilitate a basement excavation adjacent to the River Thames on behalf of joint venture developers Sainsburys and Barratt Homes. The site was historically a coal-fired... Fulham Wharf

Read more

Battersea Powerstation

Keltbray Group remain involved in a number of works in relation to the redevelopment of Battersea Powers tation.  Keltbray Remediation were invited to input into the solution required to mitigate the risk of widespread asbestos contamination in Made Ground soils... Battersea Powerstation

Read more

Hoe Valley

Crest Nicholson purchased the 1Ha site from Woking Borough Council following some preparatory works undertaken by the council.  The site was a former council tip which historically received a significant volume of asbestos waste.  The site was capped but the... Hoe Valley

Read more

W4 Regent Street

Keltbray Group were appointed by the Client Crown Estate for the demolition, facade retention and piling works at the W4 site immediately behind Regents Street in London. Keltbray Piling were employed to design and construct rotary bored bearing and Continuous... W4 Regent Street

Read more

Tonbridge Sidings

Keltbray Rail prides itself on offering innovative solutions to it’s clients and a Joint Venture contract with Network Rail’s Orpington Delivery Unit  proved a challenging project in very tight timescales. Network Rail’s National Delivery Services provided the Technical Specification for... Tonbridge Sidings

Read more

The Rose Bowl Soil Treatment Facility, Southampton

The Rose Bowl redevelopment works are part of a £45m project to transform the Rose Bowl stadium and grounds into a world class sports and leisure facility. Keltbray are the main contractors for the redesign, re-contouring and extension of the... The Rose Bowl Soil Treatment Facility, Southampton

Read more

Power Supply Upgrade 3A

Keltbray Rail was awarded the contract to provide Power Supply Upgrade (PSU) Phase 3A Along Track Works by Network Rail.  The two and half year contract commenced in January 2012, as part of Network Rail’s 10 year investment programme, to... Power Supply Upgrade 3A

Read more

Orchard Estate

As part of the Redbridge Council refurbishment and overhaul of the 600 homes within the tower blocks and maisonettes of the Orchard Estate Keltbray Environmental Solutions were appointed by Carillion Energy Services to undertake the removal of asbestos containing materials... Orchard Estate

Read more

New Bodleian Library

At the New Bodleian Library which is a Grade II Listed Building  works involved the entire structure being soft stripped of all existing M&E installations and all non-listed fixtures and fittings. All of the exposed internal elevations of the retained... New Bodleian Library

Read more

Magnox, Bradwell

Commissioned in 1961, Bradwell Power Station was the first commercial Magnox nuclear power station in the UK. Located in the South East of England, one and a half miles from the Essex coastline, the twin Magnox reactor, is now undergoing... Magnox, Bradwell

Read more