Keltbray Energy’s fist self-deliver renewables project Full substation build with internal AIS Equipment Build, test and commissioning 5.5 hectares of Forestry Tree…
The route has a circuit length of 97.29km and comprises 174 PL16 specification towers. Built-in 1952, it is over seventy years old,…
Keltbray Decommissioning were appointed to make safe, and recover the fire damaged nacelle. Scope of works included: Phase 1 – Preparation of…
The 275kV OHL route circuit ran from Barking Power Station to Barking National Grid Substation. Despite the route only being 2.2km in…
Ferrybridge Power Station is situated in West Yorkshire at the intersection of the M62 and the A1 (M) on a site of…
The Hunterston site is situated immediately south of Fairlie on the Ayrshire west coast. One very large Wind Turbine and associated Metrological…