The works consisted of: 96 wire runs of contact/catenary 1122no Standard Insulated Cantilevers 288no Anchor structures 76no Switches 96no Section Insulators 10,000…
The works were undertaken during a challenging access regime which sometimes only left 3.5hrs to run both contact and catenary conductors. A…
Keltbray Aspire were responsible for the installation of the new track, OLE modifications including HV Power Distribution and signal cable interface management….
Keltbray successfully dismantled the former 250m structure known as the DB Cargo Sheds so that the site for the new approach tunnels…
The full demolition involved the removal of over 200,000 tonnes of brick, concrete and fill; the equivalent of over 40 Olympic sized…