Skip to content

Content Builder Kitchen Sink

The row library

Every block, one page

This page is seeded with one of every Content Builder row so the whole library can be reviewed together.

Content Section

The workhorse. A heading, a body of rich copy, and a layout option. Most page content lives here.

  • Single, two-column, wide and contained layouts
  • Inline atoms via the editor toolbar

“The cheapest change is the one you make on a drawing.”

David Okafor

Engineering Director

Media Feature

A film at row scale

An image on one side, prose on the other. The position control decides which side the visual takes.

Opening up a retained concrete frame before design freeze
Façade retention designed alongside the permanent frame
The retained core reworked in place, avoiding a crane move
Piling rigs from above

Annotated Visual

Piling rigs from above
  1. Set out and position

    The rig is positioned to surveyed setting-out points.

  2. Bore the shaft

    A continuous bore is advanced to design depth.

  3. Concrete and test

    Concrete is tremied from the base up, then integrity-tested.

High-reach demolition at dusk

Commercial · Battersea, London, UK

Battersea Power Station

See the project

Story Highlight

Comparison Slider

The cleared site ready for piling After
The site before clearance Before

Foreword

A signed statement

Long-form copy closed off with an author lockup — used for forewords and chairman statements.

David Okafor

Engineering Director

Timeline

  1. Founded

    Keltbray begins as a groundworks contractor.

  2. Rail energisation

    The energy business delivers its first OLE package.

  3. Today

    A group of engineering businesses under one contract.

  1. Engage early

    Surveys and buildability advice during concept design.

  2. Design once

    Temporary works engineered alongside the permanent scheme.

  3. Self-deliver

    Directly employed teams and our own plant on site.

Stats

  • 48+

    Years of engineering

  • £1.2bn

    Order book. As at FY2026.

  • 98%

    Waste diverted from landfill

Icon Cards

  • Safety

    Everyone home safe, every day.

  • Integrity

    Say what we do; do what we say.

  • Innovation

    Engineering out risk and carbon.

Logo Wall

  • Stand-in logo one
  • Stand-in logo two
  • Stand-in logo three

Logo Cards

The group's specialist brands.

Person Cards

  • David Okafor

    Engineering Director

    17 years in major demolition

    David has spent two decades delivering complex demolition and enabling works across London, and writes regularly on decarbonisation and safe methods of work.

  • Priya Shah

    Head of Sustainability

    10 years in construction sustainability

    Priya leads the group's net-zero programme, from plant electrification trials to circular-economy material reuse on live sites.

Location Cards

  • Head office

    Keltbray Group

    Keltbray + Wentworth
    Shell Mex House80 StrandLondonWC2R 0DT
  • South East

    Thames Ditton - Registered Address

    Keltbray
    Ferry WorksSummer RoadThames DittonSRYKT7 0QJ

Contrast Split

  • We do

    Self-delivered engineering with our own people and plant.

  • We don't

    Sub-let the risk and manage from a distance.

Metric Comparison

Data Table

SECR energy & carbon, retained group.
Source

FY2023 (tCO₂e)

FY2024 (tCO₂e)

Scope 1 — fleet & plant

12,180

11,240

Scope 2 — electricity

1,690

1,547

Total

13,870

12,787

Reported under SECR; location-based Scope 2. Methodology notes

Data Visualisation

Five questions with one of our engineers.

Priya Shah PS

Priya Shah

What does your day look like?

Half on site, half at the drawing board — the balance is the point.

Best advice you've had?

Ask the site team first.

Topic Cards

What the benefits package covers.

  • Wellbeing

    Health cover, mental-health first aiders, cycle to work.

  • Development

    Chartership support and a funded training day per month.

Feature Columns

Accordion

Do you self-deliver?

Yes — directly employed operatives and our own plant.

Which regions do you cover?

UK-wide, from a network of regional offices.

Map

Where to find us.

  • Head office

    Keltbray Group

    Keltbray + Wentworth
    Shell Mex House80 StrandLondonWC2R 0DT

Get in touch

Talk to the team

Keltbray is a UK leader in complex engineering, delivering demolition, piling, civils and specialist works as one accountable, self-delivered contract.