CommercialBattersea, London, UK
Chesham Data Centre
Scroll to explore
Skip galleryKeltbray delivered the full enabling and foundation package for a new data centre development on a complex brownfield site in Chesham.
The scope included the construction of contiguous and sheet piled retaining walls, large-scale bulk excavation and earthworks, installation of propping systems, piling and foundations, and the delivery of permanent drainage, ducting and underground services. Key works included a 250-metre contiguous piled retaining wall reaching heights of up to 12 metres, a 70-metre sheet piled perimeter wall, 80,000m³ of bulk excavation, and the installation of 1,200 CFA bearing piles.
Combining specialist geotechnical engineering, earthworks and foundation expertise, Keltbray successfully transformed the site into a fully prepared, structurally robust platform to support the construction of the future data centre.
3 Key Facts
- Full enabling and foundation package delivered for a major data centre development:
Keltbray completed all retaining structures, earthworks, piling, foundations and below-ground infrastructure required to prepare the brownfield site for construction. - 80,000m³ of bulk excavation completed to create a construction-ready platform:
Extensive earthworks transformed the elevated site into a level development platform, supported by innovative ground improvement and engineering solutions. - Over 1,200 CFA piles installed alongside major retaining wall and foundation works:
The project included a 250-metre contiguous piled wall, a 70-metre sheet piled perimeter wall, approximately 150 pile caps, two tower crane bases and all permanent below-ground services.
Project outcomes
-
Construction-Ready Platform Successfully Delivered
The enabling works provided a stable, serviced and structurally robust platform ready for the next phase of data centre construction.
-
Complex Geotechnical and Engineering Challenges Successfully Overcome
Innovative retaining wall, propping and piling solutions enabled the safe delivery of deep excavations and large-scale foundation works across a constrained brownfield site.
-
Critical Infrastructure Delivered Safely and to Programme
Major earthworks, piling, foundations and underground services were completed efficiently, enabling the successful progression of a strategically important data centre development.