Keltbray is delivering the Balance of Plant package for Richborough Energy Park, a major Battery Energy Storage System (BESS) development in Ramsgate supporting the UK’s transition towards a lower-carbon energy system.

Our scope includes the Enabling Works package, alongside the civil and electrical infrastructure required for the facility, including foundations, drainage, access routes, cabling networks, earthworks, specialist equipment islands and the complete electrical scope. This also includes the remediation of a former asbestos landfill, with specialist in-house teams safely managing asbestos-contaminated materials and preparing the development platform required for the Energy Park.

Keltbray Lifting Services is providing specialist lifting support across the project, developing bespoke lifting plans for heavy and oversized energy infrastructure. Working across multiple work fronts, the team managed crane positioning, access constraints and interfaces with concurrent activities to support the safe and efficient installation of key equipment.

Once operational, the BESS will capture and store surplus energy generated from renewable sources, including solar and wind, for use when demand requires it. This helps prevent valuable renewable energy from going unused while supporting a more flexible and resilient energy system.

Keltbray has also secured the operations and maintenance contract for the facility. Over the next 10 years, we will operate and maintain the Energy Park, bringing our expertise to the long-term performance of this nationally significant infrastructure.

Richborough strengthens Keltbray’s growing role in the UK energy sector, combining our civil, electrical, lifting and operational capabilities to deliver complex infrastructure that supports the country’s transition towards a lower-carbon future.


Key Facts

  • Full Balance of Plant and electrical scope: Keltbray is delivering the integrated civil and electrical infrastructure required to bring the BESS facility into operation.
  • Specialist remediation and lifting expertise: in-house teams are delivering licensed asbestos remediation alongside specialist lifting support for heavy and oversized energy infrastructure.
  • Delivering at scale: delivered 800+ concrete bases, 28km of underground ducting and 70km of cabling, alongside a 400kV grid connection to the National Grid compound.

Curious to learn more? Watch the full case study:

Outcomes

  • Integrated BESS infrastructure

    Civil, electrical and specialist works are creating the integrated infrastructure required to bring the BESS facility into operation.

  • Complex legacy site transformed

    Remediation, earthworks and enabling works are transforming the former industrial site into a suitable platform for strategic energy infrastructure.

  • Long-term operational capability

    Keltbray’s 10-year operations and maintenance contract extends our role beyond construction, supporting the long-term performance of this strategic energy infrastructure