Keltbray delivered one of its largest schemes to date at Salisbury Square, the future headquarters for the City of London Police and a landmark £600 million development in the heart of the Square Mile.

The project spans an area four times the size of St Paul’s Cathedral and includes an 18-metre-deep basement for specialist policing facilities. Its scale and complexity required tight coordination and a fully integrated delivery approach.

Keltbray was appointed to deliver the piling, ground engineering, temporary works and logistics, bringing together specialist in-house capabilities to support the complex below-ground infrastructure.

Ground engineering was central to the project’s success. Keltbray installed 434 secant piles, 55 contiguous piles and 26 bearing piles, alongside the excavation of more than 62,000m³ of material to create a new three-storey basement.

The project presented significant geotechnical challenges, including varying ground levels and differing ground pressures adjacent to neighbouring structures. Keltbray developed a hybrid retaining solution combining cantilever and temporary propping systems, enabling deep excavation while maintaining strict ground movement tolerances.

A sophisticated temporary works propping system, designed by Keltbray’s in-house engineering specialists, Wentworth, maintained excavation stability throughout construction.

Building on these below-ground works, Keltbray combined its structural, concrete and logistics capabilities to maintain programme certainty. Key achievements included installing 9,000 tonnes of reinforcement and placing 40,000m³ of concrete, while supporting circular economy principles through the reuse of 785 tonnes of steel.

Scheduled for completion in early 2027, Salisbury Square will play a significant role in the future of policing and public service in the City of London. Keltbray is proud to have contributed to a project that showcases collaborative engineering excellence on a civic scale.


Project outcomes

  • Excavation

    Removed more than 62,000m³ of material to create a new three-storey basement.

  • Retention system

    Installed a complex piled retention system to support the deep basement.

  • Temporary works

    Developed bespoke solutions to manage ground pressures and movement.

  • Stable infrastructure

    Created the infrastructure required to support a major civic and commercial development.

  • Sustainable engineering

    Major reinforcement and concrete works with carbon savings through steel reuse.

  • Urban delivery

    Delivered complex works within a constrained urban environment surrounded by sensitive assets.

Before and after

Salisbury Square. Keltbray site. London. UK 2 August 2025

Photo by Zute Lightfoot of behalf of Keltbray After
Salisbury Square, Central London, Keltbray site. London. UK. 3 Sep 2024 

Photo by Zute Lightfoot of behalf of Keltbray. Before

Before and after

Aerial view of a large urban construction site with multiple cranes, exposed concrete structures, and surrounding city buildings. After
Aerial top-down view of a large urban construction site surrounded by city buildings, with cranes, blue structural supports, and exposed framework visible. Before

Check out more on the video:

Share "Salisbury Square"

More projects

All projects