CommercialBattersea, London, UK
100 New Bridge Street
Scroll to explore
Skip galleryKeltbray supported Mace in the redevelopment of 100 New Bridge Street, delivering a programme of structural alterations and new steel and concrete works across the existing building. The scope included a full soft strip, cladding removal, demolition of plant rooms and satellite cores, and selective slab and column removal. The team also designed, supplied and installed new steelwork, including a three‑storey office extension and a Vierendeel truss to replace the former reinforced‑concrete core.
Sustainability targets shaped the project from the outset. The scheme aimed for high circular‑economy performance, achieving extensive material retention and waste reduction. By reusing 91% of the reinforced‑concrete lift cores and 85% of the reinforced‑concrete walls, the team significantly reduced the need for new materials. Mace estimated that these measures saved 1,795 tonnes of CO₂e, supported by early collaboration between Helical, Keltbray, Mace and the wider project team.
The project demonstrated how the circular economy can be integrated into central London redevelopment. By combining structural demolition, steelwork installation and new sub and superstructure elements with a sustainability‑led approach, the team delivered a scheme that met both contemporary performance standards and carbon‑reduction ambitions.
Project outcomes
-
Structural delivery
Successful structural delivery, achieved through the completion of complex demolition, strengthening and new steelwork while maintaining programme certainty.
-
Sustainability gains
Major sustainability gains, driven by significant CO₂e savings and high levels of material retention through circular‑economy measures.
What we stand for
- Target reuse
- 95%
- The project targeted a reuse and recycling of construction waste
- Retained
- 91%
- Reinforced concrete lift cores retained
- Walls retained
- 85%
- Reinforced concrete walls retained
- Avoided CO2e
- 1,795 tonnes
- CO2e were avoided through circular economy measures
What the client says
“100 New Bridge Street embodies Helical’s ‘carbon-friendly new build’ model, retaining as much of the existing building as possible while creating a building that meets the demands of today’s occupiers. Early engagement and collaboration with Keltbray has been key in delivering the ambitions of this project.”
Laura Beaumont
Head of Sustainability, Helical
“The work at 100 New Bridge Street is a great example of our site team working collaboratively to help achieve our client’s circular economy ambitions. The flexible approach by the project team has enabled waste reduction and resulted in positive benefits for the local community who have received these items.”
Aisling Reynolds
Head of Environmental Sustainability, Keltbray