We have built a reputation founded on engineering excellence, ownership and trusted partnerships. These principles remain at the heart of who we are and how we deliver every project.

As a specialist engineering led construction group, Keltbray brings together technical know how and practical delivery to make complex projects feel achievable. Keeping our core capability in house allows us to stay focused, accountable and able to give clients real certainty from start to finish.

Engineering sits at the heart of who we are — driving us to deliver better, simpler and more reliable outcomes every time.

Brendan Kerr

Owner and Executive Chairman

An engineering led approach

For us, engineering isn't just a discipline — it's how we think, how we solve problems and how we bring clarity to complexity. It shapes the way we listen, question and understand what a project really needs before we start looking for solutions.

Early engagement lets us connect design and delivery from day one, so the ideas we develop are buildable, safe and realistic. By keeping our engineering and delivery teams closely aligned, we carry the technical intent all the way to site — maintaining control, avoiding rework and staying true to the original purpose of the design.

Above all, our engineering led approach is about responsibility. It's about owning the challenge, understanding the detail and using our collective expertise to deliver solutions that stand up to scrutiny in some of the most demanding environments.

Our purpose

Our purpose is to redefine how sustainable development is delivered. We use deep engineering insight to tackle complex challenges, improve performance and manage risk in a way that protects people, places and long term value.

By engaging early, working openly and keeping delivery in our own hands, we create outcomes that are safer, more efficient and genuinely sustainable — solutions that stand up today and continue to perform tomorrow.

A sustainable business model

Our business model is built to stay resilient in demanding environments and to deliver results our clients can depend on. By self delivering key work packages, we manage risk where it matters most and keep control of quality, programme, safety and cost.

Backed by the commitment and agility of our people, we deliver consistent, reliable performance — creating value not just for clients, but for the communities and places our work supports.

What we do

Our market role

We operate at the centre of the UK's built environment — supporting critical infrastructure, energy transition, and complex urban development.

Clients choose Keltbray when they need assured delivery across challenging programmes, live operations, or constrained city sites. Our integrated capability converts complexity into predictable outcomes that keep major projects moving.

Delivering certainty in complex environments

Certainty is our benchmark. We bring the controls, discipline, and specialist expertise required to protect programmes and budgets in live, high risk settings. Early risk identification, buildability insight, and real time project intelligence help us maintain performance under pressure — so outcomes are delivered safely, on time, on budget, and to the required standard.

Our purpose is to deliver certainty in the most technically demanding construction and engineering environments by taking accountability for performance and outcomes.

Karl Goose

Chief Executive Officer

Innovation, R&D and technical investment

Innovation is embedded in our delivery. We invest in digital design, advanced engineering analysis, modern construction methods, lower carbon materials, and bespoke plant to improve buildability, reduce carbon, and increase predictability. Our engineers and R&D teams test, refine, and deploy solutions that unlock commercial value — whether optimising temporary works, designing complex lifts, or streamlining site logistics.

Why we do it

We exist to help clients upgrade, enhance, and decarbonise critical assets. By integrating engineering, execution, and sustainability, we deliver solutions that meet evolving regulatory, operational, and commercial demands — supporting long term resilience and value.

How we do it

A distinctive delivery model underpins our approach:

  • Early engineering engagement to optimise strategy and buildability
  • Self delivery of key packages to reduce interfaces and manage risk at source
  • Data driven controls to maintain safety, quality, and programme discipline
  • Technical assurance to validate decisions and uphold standards throughout

Our people

Our people are the driving force behind everything we achieve. Their skills, their ambition, and their commitment to our values are what turn strategy into impact.

Neil Patterson

Group People Director

Engineering expertise

Our people are the engine of our performance. Their specialist knowledge and practical capability enable us to improve buildability, control risk, and deliver predictable results — from early design through to commissioning.

We bring engineering, construction, design, safety, digital, commercial, and project controls together under one roof. This eliminates silos, speeds decision making, and ensures one accountable team focused on value, not handoffs — giving stronger risk management, better change control, consistent standards, and clearer commercial outcomes.

Culture, training and development

Our culture is built on accountability, safety, technical excellence, and continuous improvement. We invest in accredited training, apprenticeships, leadership programmes, and specialist skills, supporting progression at every level. Wellbeing and inclusion are integral — creating a workplace where people perform at their best.

Technical assurance and leadership

Technical assurance safeguards quality and compliance. Our leaders set engineering direction, validate critical decisions, and mentor teams — embedding consistent standards from feasibility to final assurance. This governance gives clients confidence that solutions are buildable, compliant, and right first time.

Core services

What differentiates us is not only the strength of each individual specialist service, but our ability to integrate them into a single, controlled delivery model.

Lee Cain

Chief Operating Officer

Early engagement and pre-construction

Keltbray engages early in the development of complex projects to shape practical, buildable and commercially robust delivery strategies. Through Early Contractor Involvement (ECI), Pre-Construction Services Agreements (PCSA) and Front-End Engineering and Design (FEED), we support clients in translating concept designs into safe and deliverable construction solutions.

Our engineering-led teams bring together expertise across demolition, enabling works, civil engineering, ground engineering and structural construction. This breadth of capability allows us to provide informed input on construction methodology, sequencing, logistics and temporary works strategies from the earliest stages of project development.

This early engagement is particularly valuable on projects involving constrained urban environments, technically complex structures, large-scale infrastructure or ecologically significant energy-related developments. By integrating engineering thinking with practical delivery expertise and environmental stewardship, we help clients identify and manage risk early, optimise buildability and improve programme and cost certainty.

Demolition and remodelling

With extensive experience across commercial, residential, industrial, city centre and complex urban environments throughout the UK, Keltbray is recognised as a leader in the demolition sector. We provide expert advice and deliver the most effective methodologies for demolition, deconstruction and complex remodelling projects, even in the most constrained and technically challenging settings.

Our capabilities range from full structural demolition to highly intricate remodelling and refurbishment schemes, including projects requiring the retention, temporary support or alteration of existing structures. This includes façade retention, partial demolition, structural alterations and works within live or occupied environments, where safety, precision and programme certainty are critical.

Keltbray offers an integrated approach, combining demolition expertise with associated civil engineering and enabling works. Our teams specialise in selecting the right strategy for each project, including sequencing, temporary works design and innovative construction methodologies, to unlock sites safely and efficiently while managing risk to surrounding assets and stakeholders.

Specialist engineering services

For over 25 years, our in-house engineering consultancy, Wentworth, has delivered high quality, fully integrated solutions across permanent and temporary works, geotechnical engineering, testing, verification and design. Their depth of expertise spans some of the industry's most complex and technically demanding projects, consistently achieving exceptional standards and expert performance.

Having Wentworth embedded within Keltbray gives us a distinct advantage. It enables us to design and deliver truly seamless end to end solutions — aligning engineering strategy from early design through to construction. This integrated approach reduces interfaces, streamlines decision-making, and minimises the number of parties involved in the process, ultimately enhancing efficiency, certainty and project outcomes.

Piling and ground engineering

Established in 2008, Keltbray's piling and ground engineering business delivers a comprehensive range of conventional and advanced solutions, working collaboratively with clients and project teams to engineer the most efficient, sustainable and buildable outcomes.

Our piling and ground engineering services can be delivered as a standalone specialist package or as a fully integrated part of Keltbray's end to end enabling works offering. This is particularly valuable on complex sites where piling works follow directly from demolition and site clearance activities, enabling a seamless transition into foundation, substructure and basement construction while maintaining programme certainty and reducing interface risk.

Our technical capabilities include both standard and specialist piling techniques, alongside market leading innovations such as the patented, reusable, load bearing, extendable thermal energy generating HIPER® Pile. Through the adoption of modern methods of construction and off site manufacture, we have helped reduce embodied carbon in piled foundations by up to 90%, supporting clients' sustainability and net zero objectives.

Remediation

Keltbray delivers a comprehensive range of remediation solutions for contaminated land and water, providing compliant, sustainable outcomes that support development on complex and constrained sites. We manage the full remediation process, securing the necessary regulatory approvals and working closely with stakeholders to ensure sites are remediated efficiently and to the highest standards.

A key differentiator is our extensive in house plant, equipment and skilled workforce, enabling Keltbray to self deliver remediation works with greater control over quality, safety and programme. By minimising reliance on third party resources, we provide more resilient delivery models, improved cost certainty and rapid mobilisation on challenging sites.

We combine specialist technical expertise with strong relationships across client, consultant and regulatory teams to address complex remediation challenges, including legacy contamination, chemical hazards and geotechnical constraints. Our design and build solutions are tailored to site specific conditions, de risking development while meeting stringent environmental and regulatory requirements.

Asbestos removal

Keltbray is recognised as one of the UK's most experienced asbestos removal contractors, with a strong reputation for innovation, reliability and safe delivery. Our environmental services team operates nationally and across all sectors, including commercial, residential, industrial, infrastructure and complex urban redevelopment projects.

We provide a fully compliant, practically led approach to asbestos removal and hazardous material management, ensuring safety, quality and regulatory compliance at every stage. Our services can be delivered as a standalone specialist package or as a critical preparatory phase supporting enabling works, demolition and remodelling projects, helping to de risk sites and enable subsequent construction activities to proceed safely and efficiently.

Early engagement of our asbestos removal specialists allows for effective planning, sequencing and coordination with demolition and remediation works, particularly on constrained or technically complex sites. This integrated approach reduces programme risk, minimises disruption and ensures a smooth transition into wider enabling and redevelopment phases.

Environmental and land decontamination

Keltbray delivers targeted environmental and land decontamination solutions that address pollutants, legacy contamination and environmental risk, reducing liabilities and unlocking land for safe and sustainable future use. Our approach is technically robust, regulator focused and designed to support development on complex and constrained sites.

A key strength of our offering is our skilled, multidisciplinary environmental team, combining technical expertise with practical delivery experience. This enables us to assess site conditions holistically, develop proportionate remediation and decontamination strategies, and implement solutions that are both compliant and buildable.

By integrating environmental and land decontamination activities within an engineering led delivery model, we help de risk development programmes, improve cost certainty and accelerate progress on site.

Major civils and earthworks

Keltbray delivers major civils and earthworks solutions that enable the safe, efficient preparation and delivery of complex infrastructure and development projects. Our teams manage all aspects of bulk earthworks, ground engineering and enabling works to create stable, compliant platforms for onward construction.

With integrated design capability and extensive in-house plant, equipment and specialist expertise, we provide predictable, high-quality outcomes across challenging sites and environments. From large-scale earthworks to complex civil engineering packages, Keltbray offers fully coordinated, cost-effective solutions that reduce programme risk and support the successful delivery of major projects.

Building and structures

Keltbray delivers complex reinforced concrete frames and structural engineering solutions across a wide range of sectors, including deep basements, high rise cores and technically demanding construction environments. Our expertise spans the design and construction of hybrid structures using in situ concrete and post tensioned systems tailored to meet the specific demands of each project.

We adopt an integrated, engineering led approach, providing early design input, value engineering and buildability support to optimise structural solutions from the outset. This collaborative methodology enables us to manage risk, improve programme certainty and deliver efficient, high quality outcomes on complex sites.

Our in house capability is supported by a comprehensive range of specialist plant, formwork systems and experienced delivery teams, allowing us to self perform critical structural works with a high degree of control over safety, quality and programme.

Heavy lifting services

Keltbray provides one of the UK's most capable heavy lifting solutions, supporting construction and infrastructure projects from concept through to completion. Our teams deliver fully managed, turnkey lifting operations — ranging from small-scale lifts to some of the heaviest crane lifts ever undertaken in the UK.

With extensive in-house expertise, specialist equipment and proven engineering capability, we plan and execute complex lifting activities safely, efficiently and to the highest industry standards. Safety is central to our approach, with every lift designed and delivered to minimise risk and environmental impact while ensuring predictable, high-quality outcomes.

Core sectors

Keltbray operates across a broad range of sectors, delivering integrated engineering and construction solutions for complex, high profile projects throughout the UK.

Our business is underpinned by two principal revenue streams: the delivery of complex building and civil projects within challenging urban environments, and a growing national infrastructure portfolio supporting the UK's critical assets.

Across both public and private markets, our engineering led approach enables us to support clients from early stage development and enabling works through to construction delivery. By retaining critical capabilities in house and managing interfaces proactively, we provide greater certainty over safety, quality, programme and outcomes in some of the industry's most demanding environments.

  • Commercial and mixed use

    A trusted brand in commercial and mixed use development, supporting complex city centre and regeneration projects through demolition, remodelling, remediation, enabling works and specialist civil engineering.

  • Aviation

    A proven track record in aviation infrastructure, operating within established frameworks at both Heathrow and Gatwick, delivering safely inside highly regulated, live operational environments.

  • Transport

    Transport infrastructure from major national programmes such as HS2 to complex urban developments, delivered as a Tier 1 partner through a collaborative model that ensures accountability and programme certainty.

  • Civils for energy infrastructure

    Specialist civil works supporting the development, expansion and resilience of the UK's energy infrastructure, with particular strength in renewables and battery energy storage systems.

  • Nuclear

    Proven capability built on extensive experience at Sellafield and within similarly regulated environments, underpinned by rigorous safety standards and a mature approach to risk.

  • Industrial and nuclear decommissioning

    Turnkey decommissioning across complex industrial and nuclear environments, including recognised leadership in controlled collapse demolition using engineered mechanical or explosive techniques.

Office locations

Keltbray operates across a broad range of sectors, delivering integrated engineering and construction solutions for complex, high profile projects throughout the UK. Our expertise spans both public and private sectors, enabling us to support clients from early stage development through to full project delivery.

  • Middle East

    Dubai

    Wentworth
    Level 27Marina PlazaDubai Marina
  • Yorkshire

    Leeds

    Wentworth
    Office 96-1004100 Park ApproachLeedsLS15 8GB
  • South West

    Bristol

    Wentworth
    CastlemeadLower Castle StreetBristolBS1 3AG
  • London

    Plaistow Wharf

    Keltbray
    Keltbray Environmental LtdSt Vincent Ferrer LaneOff Dock RoadSilvertownLondonE16 2AB
  • London

    Thames Road Office & Depot

    Keltbray
    Thames Road Industrial EstateSilvertownLondonE16 2EZ
  • Scotland

    Glasgow

    Keltbray
    Dundas Court38-40 New City RoadGlasgowGLGG4 9JT
  • Northern Ireland

    Belfast

    Keltbray
    Kerr Property Holdings Ltd38-40 Bank StreetBelfastBT1 1HL
  • South East

    Thames Ditton - Registered Address

    Keltbray
    Ferry WorksSummer RoadThames DittonSRYKT7 0QJ
  • Head office

    Keltbray Group

    Keltbray + Wentworth
    Shell Mex House80 StrandLondonWC2R 0DT

Case studies

Our work speaks loudest when it's seen in action. Every project reflects our commitment to early collaboration, rigorous planning and delivering certainty for our clients.

I'm proud to showcase the projects that demonstrate not only what we build, but how we think, partner and innovate.

Martin Hinde

Managed Director - Commercial and Regulated Estates

Richborough

Civils for energy infrastructure · Pacific Green

Keltbray delivered the full Balance of Plant package for a new battery storage facility, designing and constructing all civil and electrical infrastructure required to bring the site into operation. This included foundations, drainage, access roads, extensive cabling networks, earthworks, and the creation of seven specialist equipment islands with reinforced bases, complex ducting and bespoke containment systems for long term reliability.

Keltbray also delivered the complete electrical scope, from substation works and internal cabling to security systems and final National Grid connection, securing the necessary Environment Agency approvals to build the drainage outfall beside a tidal river.

One of the project's key challenges — installing 30 tonne PCS and BESS units within a tightly constrained site — was overcome through a bespoke lifting solution engineered by Keltbray Lifting, enabling safe, efficient installation without disrupting ongoing works.

The battery storage facility at Richborough Energy Park

Scope

  • Design and build of the Battery Energy Storage System
  • Procurement and installation of all equipment
  • Construction of associated civil and electrical works
  • Commissioning and testing of the full system
  • Connection to the 400kV National Grid

Energy · Kent

Richborough Energy Park

View the project

Fifty Fenchurch Street

Commercial and mixed use · AXA Investment Managers / Yard Nine

Keltbray is delivering a full package of enabling works, demolition, piling, excavation, basement construction, substructure and concrete core works on a highly constrained City of London site bordered by two protected historic structures.

The project involves the safe removal of existing buildings with zero waste to landfill, followed by the excavation of an 81,000m³, 17 metre deep basement just metres from a 400 year old Grade I listed tower — completed without any movement to the heritage asset thanks to advanced modelling and real time monitoring.

Our in house engineering team designed bespoke temporary works to maintain stability throughout demolition and excavation, while heritage elements such as the crypt were carefully removed for restoration and the tower was fully supported to allow construction beneath and around it.

“Maintaining the integrity of the tower while excavating beneath it — supported on just four plunge columns — makes 50 Fenchurch Street one of the most technically demanding and standout engineering projects we've delivered.”

Harvey White

Keltbray Project Manager

The Fifty Fenchurch Street site in the City of London

Scope

  • Enabling works
  • Structural demolition
  • Piling and CFA wall construction
  • Bulk excavation and earthworks
  • Basement construction
  • Temporary works
  • Substructure
  • Concrete core construction

Commercial · City of London

50 Fenchurch Street

View the project

1 Victoria Street

Commercial and mixed use · Mitsubishi Estate Property London and Stanhope PLC

1 Victoria Street was ready for renewal, and Keltbray approached its remodelling with a clear focus: retain value, minimise waste and give the building a responsible second life. Guided by circular economy principles, we looked for reuse opportunities at every turn — recovering thousands of floor tiles, dismantling nearly 2,000 windows and diverting more than 110 tonnes of glass into high quality recycling streams.

The structural transformation was carried out with the same care: lifts removed, floors taken down in sequence and the building sensitively opened for its next purpose.

More than 50,000 items — from furniture to fixtures — were donated to local community groups, creating direct social value. Partnerships like our closed loop recycling initiative with Saint Gobain ensured reclaimed materials were not only diverted from waste, but turned into new products.

“1 Victoria Street is a testament to the power of the circular economy. By working together, consultants and site teams have transformed this project into a model of sustainability. Not only are we reducing waste, but we're also ensuring valuable materials find new homes in the community, making the biggest possible impact.”

Helena Morris

Development Director, Stanhope

Demolition works at 1 Victoria Street

Scope

  • Asbestos removal
  • Soft strip
  • Structural demolition
  • Drainage
  • Site investigations
  • Pile enabling
  • Concrete frame and precast
  • Basement construction

Commercial · London

1 Victoria Street

View the project

Salisbury Square

Commercial and mixed use · City of London Corporation

Keltbray delivered one of its largest schemes to date at Salisbury Square — the new headquarters for the City of London Police and a landmark £600 million development in the heart of the Square Mile. The project spans an area four times the size of St Paul's Cathedral and includes an 18 metre deep basement designed to accommodate specialist policing facilities.

The scale and complexity of the works demanded tight coordination and a fully integrated delivery approach. By combining our in house structural, temporary works, concrete, and logistics capabilities, we maintained programme certainty while embedding circular economy principles throughout delivery.

Key achievements included installing 9,000 tonnes of reinforcement, placing 40,000 m³ of concrete, and achieving major carbon savings through the reuse of 785 tonnes of steel. Scheduled for completion in early 2027, Salisbury Square will play a significant role in the future of policing and public service in the City of London.

The Salisbury Square development

Scope

  • 18m deep basement
  • Substructure and superstructure work
  • Integrated delivery across multiple specialist disciplines

Commercial · City of London

Salisbury Square

View the project

Heathrow Airport

Aviation · Heathrow

Keltbray has delivered a series of essential infrastructure packages at Heathrow Airport, supporting the operation of one of the world's busiest aviation hubs. Working across airside and landside environments, we completed pavement renewals, drainage upgrades, stand enhancements, and key enabling works that maintain airport resilience and capacity.

Operating within a live, high security environment required disciplined planning and precise execution. Our teams delivered the works within tight night time possession windows, coordinating closely with operational teams to ensure zero disruption to aircraft movements or passenger services.

Our work has helped enhance the reliability, safety and long term performance of Heathrow's critical infrastructure.

Airside civil engineering works at Heathrow

Scope

  • Airside and landside civil engineering
  • Pavement and taxiway upgrades
  • Asset renewal and enabling works
  • Night time and possession based delivery

Sellafield

Nuclear · Sellafield Ltd

Keltbray delivered the Phase 1 enabling works within the ILW East Zone, laying the groundwork for major future developments including LSS1 and BEPPS2. The scope covered extensive excavation to formation level, installation of drainage, roads and ducting, temporary surface-water management, and associated supporting infrastructure.

A defining challenge was operating within a high-security nuclear environment. Working inside the secure perimeter of the Sellafield site meant every activity required meticulous planning, rigorous risk assessment, and authorisation to meet stringent nuclear safety and security protocols.

To meet these demands, the team embedded security considerations into every stage of delivery, from early planning and induction through to execution. Daily coordination with the client's security and health-physics teams ensured that plant, personnel, and deliveries complied with access controls, virtual lane systems, and radiological-clearance requirements.

“Keltbray delivered an outstanding project at Sellafield, exceeding expectations through exemplary safety, quality, programme management and social value, and earning strong client endorsement for a complex and challenging scope of work.”

Andrew Haile

Senior Project Manager – Nuclear, Morgan Sindall

Scope

  • Enabling works
  • Large-scale excavation to formation level
  • Drainage works
  • Road and ducting installation
  • Temporary surface water management
  • Supporting infrastructure

Sellafield, West Cumbria, UK

Sellafield ILW Bulk Earthworks & Drainage Contract

View the project

Chesham data centre

Civils for energy infrastructure · Bucks DC Limited

Keltbray delivered the full enabling and foundation package for a new data centre on a complex brownfield site. Works included a 250 metre contiguous piled wall cantilevering to 12 metres and a 70 metre sheet piled perimeter, both completed with reinforced capping beams.

The team undertook 80,000m³ of bulk excavation, followed by a combined temporary and permanent propping solution using MGF props, RC beams and CFA piles. Keltbray installed 1,200 CFA bearing piles, constructed around 150 pile caps and two tower crane bases, and delivered all permanent drainage, ducting and underground tanks.

These works provided a fully prepared, structurally robust platform for the data centre, delivered safely and to programme.

Piling works at the Chesham data centre

Scope

  • Construction of contiguous and sheet piled retaining walls
  • Delivery of bulk excavation and earthworks
  • Installation of propping systems, piling and foundations
  • Delivery of permanent drainage, ducting and underground services

HS2 Curzon Street station

Transport · HS2

Keltbray is delivering the enabling, groundworks and piling package for the new HS2 Curzon Street Station for Mace Dragados JV. Early works include a full site strip, haul road construction, berm removal and reduced level excavation, along with extensive utilities investigations, diversions, drainage installations and protection of live services.

Keltbray constructed the piling mat and installed 86 m of contiguous rotary bored piles adjacent to live Network Rail assets, followed by the RC capping beam and bulk excavation.

Across the wider 100,000 m² site, Keltbray is preparing the platform for future station foundations, including remediation and service diversions. The team is also installing 2,000 piles to support the station building, platforms and the interlocking piled walls forming the station basement.

Groundworks at HS2 Curzon Street station

Scope

  • Early enabling works across a 9 acre site
  • Groundworks, utility diversions and remediation
  • Construction of piling mat and contiguous piled wall
  • Installation of 2,000 piles for station and basement structures

Transport · Birmingham, Midlands

HS2 Curzon Street Station

View the project

6–8 Bishopsgate

Commercial and mixed use · Mitsubishi Estate Property London and Stanhope PLC

Keltbray delivered the full demolition, enabling works, piling, basement excavation and reinforced concrete construction for the redevelopment of 6–8 Bishopsgate and 150 Leadenhall, clearing the site for the new 50 storey 8 Bishopsgate tower.

The works included asbestos removal, soft strip, full structural demolition to B1, complex temporary works design by Wentworth, and extensive pile probing and backfilling. Following demolition, Keltbray executed the piling strategy, secant wall installation, excavation, propping and construction of the new B2 slab, while maintaining the stability of neighbouring assets including 22 Bishopsgate.

Operating within a highly constrained City of London site, Keltbray managed significant logistical and stakeholder challenges — from shared access routes and heritage constraints to TfL interfaces, party wall agreements, live utility protection and archaeological findings.

The 6–8 Bishopsgate site

Scope

  • Demolition
  • Enabling works
  • Piling
  • Basement excavation
  • Slab construction
  • Concrete works
  • Temporary works
  • Asbestos surveying

76–78 Upper Ground

Commercial and mixed use · Stanhope

Keltbray delivered the complex enabling, temporary works, substructure and superstructure phases for the redevelopment of the Grade II listed 76–78 Upper Ground building on London's South Bank. The scheme expanded the former IBM headquarters from 200,000 sq ft to around 300,000 sq ft, requiring major demolition works, removal of existing slabs and full deconstruction of the original structural cores.

Our in house engineering consultancy, Wentworth, designed extensive temporary works to maintain stability while protecting exposed heritage elements. Working in a constrained, highly sensitive location adjacent to the National Theatre, we managed strict logistics, community liaison and performance based noise constraints throughout delivery.

A major circular economy strategy saw significant materials — including listed granite panels, brickwork, paving blocks and raised access flooring — carefully salvaged and reused, preventing substantial carbon emissions.

76–78 Upper Ground on London's South Bank

Scope

  • Demolition
  • Enabling works
  • Soft strip
  • Temporary works
  • Piling
  • Substructure
  • Superstructure

Ferrybridge Power Station

Industrial and nuclear decommissioning · SSE Renewable Energy

Keltbray delivered the decommissioning and controlled demolition of Ferrybridge Power Station in West Yorkshire, acting as Principal Contractor and Principal Designer across a highly complex, multi hazard site.

The works involved large scale asbestos removal, mechanical and explosive demolition of the main steel boiler house structures, the controlled collapse of eight reinforced concrete cooling towers, and the demolition of two 198 metre chimneys, along with extensive ancillary structures including the original coal barge unloader on the River Aire.

Operating in close proximity to a live National Grid substation, overhead HV lines, adjacent energy from waste facilities, major highways and neighbouring communities, Keltbray implemented rigorous environmental controls, continuous air and vibration monitoring, and best available technology dust and waste management systems. More than 250,000 tonnes of concrete and brick were processed and reused on site, with over 100,000 tonnes of scrap metal recycled.

The controlled demolition of Ferrybridge Power Station

Scope

  • Decommissioning
  • Controlled collapse demolition
  • Blasting
  • Asbestos surveying and removal

Energy · Ferrybridge, West Yorkshire

Ferrybridge Power Station

View the project

Museum of London

Commercial and mixed use · London Museum

Keltbray delivered the complex transformation of the historic Smithfield Market buildings into the new London Museum, working alongside Wentworth to combine structural redevelopment with sensitive heritage preservation. The scheme revitalised two Grade II listed market halls — the General Market and the Poultry Market — and required extensive temporary works, structural alterations and careful conservation of original façades and historic features.

Our integrated delivery model, covering demolition, groundworks, engineering solutions and temporary works, enabled the team to respond quickly to discoveries typical of buildings of this age, including hidden vaults and historic infrastructure. Operating within a constrained Central London location, we managed significant logistical challenges while prioritising the sustainable reuse of materials.

“Smithfield asked us to honour the past while engineering its future — a challenge that pushed our creativity and showcased what Keltbray does best.”

Kieran Whyte

Project Manager, Keltbray

The Smithfield market halls becoming the London Museum

Scope

  • Demolition
  • Groundworks and excavation
  • Engineering solutions
  • Temporary works
  • Structural alterations

Commercial · City Of London

London Museum

View the project

HS2 Sublot 2B viaducts

Transport · Balfour Beatty Vinci

Keltbray is delivering a portfolio of major viaduct structures as part of the HS2 Sublot 2B scheme, including Balsall Common Viaduct, Marsh Farm Viaduct and River Blythe Viaduct. Collectively, these structures form a critical section of the HS2 route, carrying two high speed rail tracks across watercourses, flood plains and local transport corridors.

The viaducts are predominantly constructed using precast concrete beam solutions with in situ reinforced concrete decks, supported on reinforced concrete piers and abutments founded on deep piled foundations. Beam spans typically range from approximately 20m to 25m, with structures configured as continuous bridge units separated by expansion joints.

A key delivery challenge is the integration of multiple structural interfaces, including piled foundations installed by others, bearings, precast superstructure elements and extensive in situ concrete works. Each structure requires precise setting out and tolerance control to meet the demanding standards associated with high speed rail infrastructure.

An HS2 viaduct under construction

Scope

  • Delivery of multiple major HS2 viaducts within a complex, multi asset rail programme
  • Precast beam viaduct construction with in situ reinforced concrete decks
  • Managing complex interfaces, integrating piled foundations, bearings and superstructure works
  • Precision setting out and tolerance control to meet high speed rail performance standards

HS2 C1 shafts

Transport · Align JV

Keltbray delivered the reinforced concrete works for five HS2 C1 ventilation and access shafts in Buckinghamshire, overcoming the significant challenge of constructing complex structures up to 65 metres below ground in tightly constrained conditions.

The project required the installation of deep base plugs and large scale tunnel interface collars that stabilised diaphragm walls and enabled TBMs to safely pass through the shafts, while allowing for future tunnel breakthrough.

To manage programme and logistical risk, Keltbray deployed slipform construction for the main shafts, operating 24/7 to maintain momentum and certainty. This approach, combined with careful coordination with tunnelling teams and a phased transition from deep below ground works to above ground construction, ensured safe, efficient delivery of a technically demanding scope.

An HS2 C1 ventilation shaft

Scope

  • Construction of reinforced concrete works for five HS2 ventilation and access shafts
  • Concrete works carried out up to 65 metres below ground
  • Installation of base slabs and tunnel interface structures
  • Construction of main shaft structures using slipform construction
  • Delivery of basements, ground floors and all above ground concrete works

Health, safety and wellbeing

At Keltbray, health, safety and wellbeing are fundamental to how we plan and deliver work. Our Promote Health, Prevent Harm (PH²) strategy integrates physical safety, occupational health and mental wellbeing into a single, embedded framework that informs leadership decisions and site level behaviours alike.

We focus on making safety simple, practical and relevant, using clear communication tools, including Visual Standards, to ensure expectations are consistently understood and applied across all projects.

Assurance systems and digital reporting

Our assurance framework provides transparency, accountability and continuous improvement across all activities. Statutory and best practice requirements are translated into usable procedures, supported by Back to Basics summaries and Visual Standards that clearly show what good looks like at the point of work. Digital inspection, audit and incident management systems, managed by live project dashboards, provide real time performance insight to project teams, directors and clients.

  • KML Occupational Health

    We are proud of our in-house occupational health provider, KML Occupational Health, which delivers on its mission of helping to maintain a healthy workforce through a comprehensive range of physical and non-physical occupational health services, including those around mental health and wellbeing.

  • Stick to the Plan

    Stick to the Plan defines how we turn health and safety strategy into everyday behaviour. It provides a clear, shared framework that empowers our people to follow agreed safe systems of work and stop activities where conditions change or a plan is unclear.

  • Promote Health, Prevent Harm

    Keltbray takes a holistic approach to occupational health and wellbeing through an equal focus on physical and mental health, managing health risks with the same rigour as safety risks — integrating surveillance, exposure monitoring, mental health support and wellbeing initiatives into how work is planned and delivered.

Sustainability and ESG commitments

Keltbray's sustainability pledge is to provide innovative building and infrastructure engineering solutions that generate value to our customers and support their own sustainability commitments, whilst playing our own part in addressing the global challenges determined by the UN Sustainable Development Goals.

Holly Price

Group Assurance Director

Our purpose-led approach

As a self delivery engineering business, we own our impacts. Sustainability informs how we design, procure, and deliver — balancing environmental, social, and commercial priorities to create long term value.

Embedding sustainability in engineering decisions

Environmental performance is built in, not bolted on. Material choices, methodologies, sequencing, logistics, and temporary works are engineered to reduce carbon, waste, and disruption from the outset.

Long term resilience and responsible delivery

We enable national resilience through low carbon energy, modern transport, and sustainable regeneration. Responsible procurement, transparent reporting, and strong governance protect ecosystems and communities.

Carbon reduction and whole life performance

We help clients meet net zero ambitions through design efficiency, low carbon materials, digital optimisation, and modern methods — improving whole life outcomes, not just construction phase metrics.

Community, social value and environmental stewardship

We create local opportunity — jobs, skills, and supply chain development — while protecting biodiversity and minimising disruption. Social value is measurable and lasting.

Hiperpile

A dual-use, low carbon foundation system incorporating thermal energy storage and exchange within its hollow core.

Our Hiperpile was awarded the 2025 ICE Brunel, recognising its transformative impact on low carbon foundation engineering. In addition to dramatically cutting embodied carbon in deep piled foundations, the Hiperpile turns foundation systems into energy enabled assets, reducing whole-life cost and carbon for our clients.

The Hiperpile has already been deployed on major schemes including HS2, Manchester Airport Terminal 2, Tottenham Hotspur hotel development and The Line, NEOM in Saudi Arabia, demonstrating its applicability and value across sectors and regions.

Technical information, sector specific case studies and funding models are at hiperenergy.com.

Tangible benefits

  • Improved safety through reduced vehicle movements and pile breaking activity
  • Improved quality through the adoption of off-site manufacturing
  • Reduction in materials in piled foundations of up to 50%
  • Reduction in embodied carbon of up to 40%
  • Geothermal energy potential of up to 100kW per pile, reducing peak and annual operation costs by up to 50% for space heating and cooling and district hot water
  • Up to 50,000 litres of underground thermal storage per pile, enabling operational efficiency through load shifting — reducing grid demand and electricity costs
  • Reduced electricity costs, maintenance costs and additional roof space which would otherwise be taken up by large air source plant

Awards and recognition

  • 2,000+

    Projects delivered to date

  • 20%

    Graduates and apprentices

  • 3x

    BCIA award winner

Rising Star Award

Construction News

A testament to our talent pipeline and leadership development, celebrating the emerging professionals who drive our performance and innovation.

Hiperpile Brunel Award

ICE, 2025

Recognising innovation and excellence in piling and ground engineering — evidence of our commitment to technical advancement in complex ground conditions.

Platinum member

The 5% Club

Awarded after three consecutive years at Gold, recognising our commitment to earn and learn opportunities.

Royal Charter Award for Excellence in Construction

Worshipful Company of Constructors

For the Tower of All Hallows Staining at 50 Fenchurch Street.